|   | 
| Quick Connect 
          Installation - 3 easy steps: | |
| 1. | Attach mounting fixture (wall arm or ceiling plate) and hanger assembly to load bearing structure (wall or ceiling). | 
| 2. | Assemble yoke and monitor at ground level. | 
| 3. | Lift and hang 
        yoke and monitor assembly onto hanger assembly. Adjust tilt and swivel. 
        Securely tighten all fasteners. NOTE: Yoke and monitor assembly is HEAVY! Use assistants or mechanical lifting equipment to safely lift, position and attach the yoke and monitor assembly. | 
|  | |